Mapei Mapeproof 1K Turbo

By Mapei

Browse all primers →

SKU: MJ-MPT10-Mapei-1KTurbo-10kg
Brands:
$259.00

Choose how you’ll get it

Delivery

Enter your postcode for a delivery date.

Pick up Free

Choose collection point

Collect from: Hindmarsh, Botany, Brendale, Burleigh Heads, Molendinar, West Gosford, Hallam, Hoppers Crossing, Mansfield, Mitcham, Jesmond, Newtown, Sunshine, Thomastown, Wetherill Park, Unanderra, Yatala, Moonah, Prospect Vale, Fyshwick, Boambee

A one-component polyurethane surface membrane from Mapei, used as a moisture vapour barrier on cement-based substrates that are not subject to rising damp but have residual humidity above 80% RH, up to 95% RH, before PVC, vinyl or timber flooring goes down. It loses tack in 30 to 40 minutes at 23 degrees C and 50% RH, and timber and resilient flooring can be laid after approximately 2 hours in normal temperature and humidity conditions. Supplied in 10 kg drums for professional use.

Description

Mapei Mapeproof 1K Turbo is used to prevent flooring failure due to excessive residual humidity in the substrate, where PVC, vinyl or timber is to be laid on cement-based substrates that are not subject to rising damp. It is a one-component polyurethane surface membrane that cures with the humidity in the surrounding air and in the substrate, and it is made by Mapei.

The data sheet describes it as solvent free, odourless and non-flammable, with a short set time that lets timber and resilient flooring be laid after approximately 2 hours in normal conditions. It can also consolidate mechanically weak cement-based substrates.

Technical Specifications

Maximum residual relative humidity Up to 95% RH
Water vapour transmission rate (ASTM E 96) Less than 10 g/m2 per 24 hours
Application temperature From 5 degrees C to 35 degrees C
Loss of tack (23 degrees C, 50% RH) After 30 to 40 minutes
Set to light foot traffic (23 degrees C, 50% RH) 60 minutes
Waiting time between coats (23 degrees C, 50% RH) Minimum 40 minutes, maximum 2 hours
Waiting time before laying with polyurethane or epoxy-polyurethane adhesive (23 degrees C, 50% RH) Minimum 2 hours, maximum 24 hours
Emission rating EMICODE EC1 Plus: extremely low emission level
Consumption 0.1 to 0.4 kg/m2 per coat
Storage 12 months in the original, well-sealed drum, in a dry, elevated area; protect from sunlight and frost

Where to Use

Used as a moisture vapour barrier on cement-based substrates that are not subject to rising damp, and for consolidation:

  • Moisture vapour barrier treatment before PVC, vinyl and timber flooring
  • Consolidating mechanically weak cement-based substrates
  • Direct bonding of timber flooring with a reactive polyurethane adhesive

How to Apply

  1. Prepare the substrate. It must be clean and free of oil, wax and dirt. New concrete must be cured for at least 28 days. Cracks and crazing are opened and repaired with Eporip; remove curing compounds, laitance and contaminants mechanically as per AS 1884.
  2. Check the surface profile. For direct application, the surface must be porous, CSP #2 to #3 and uncontaminated. Otherwise profile it mechanically by dustless, engineer-approved methods. When used to consolidate, the surface must be porous enough for the product to penetrate; abrade excessively smooth substrates to open the pores.
  3. Apply. Use a roller or brush, undiluted. Do not let it puddle. One coat can be sufficient over concrete with a continuous dry film.
  4. Second coat if needed. For porous substrates such as screeds, or substrates in poor condition, apply a second layer once the first is suitable for light foot traffic. Wait 40 minutes to 2 hours between coats.
  5. Install flooring. Timber can be bonded directly with a reactive adhesive such as Ultrabond P990 1K or Ultrabond Eco S955 1K after 2 to 24 hours. If the substrate needs rectifying, or a water based adhesive is to be used, the data sheet requires a minimum 3 mm cementitious smoothing and levelling compound over the membrane: apply the membrane so a thin layer remains on the surface, allow approximately 2 hours to dry, then apply an undiluted coat of Eco Prim T Plus before the levelling compound.

Important Notes

  • Do not dilute with water or solvents, and do not apply on wet surfaces or in the presence of rising damp.
  • Do not apply on heated screeds as a vapour membrane; it is suitable there as a consolidator only.
  • If timber flooring is installed more than 24 hours after application, protect the surface from contaminants and clean thoroughly before applying adhesive.
  • For levelling over 10 mm in thickness, apply a second coat and sprinkle Quartz 0.9 AU or clean, dry sand on it while fresh, and remove loose sand once set.
  • The data sheet gives no hazard or first aid statements and refers to the Safety Data Sheet for complete information on safe use.

Key Features

  • One-component polyurethane that hardens with moisture from the air and substrate
  • Moisture vapour barrier for cement-based substrates up to 95% RH (ASTM F2170), not subject to rising damp
  • Water vapour transmission rate under 10 g/m2 per 24 hours (ASTM E 96)
  • Loses tack after 30 to 40 minutes (23 degrees C, 50% RH); timber and resilient flooring can be laid after approximately 2 hours in normal temperature and humidity conditions
  • Also used to consolidate mechanically weak cement-based substrates
  • Applied by roller or brush, 0.1 to 0.4 kg/m2 per coat
  • Data sheet: EMICODE EC1 Plus, extremely low emission level
  • Supplied in 10 kg drums

Additional information

Range

Primers

Size

10kg

Frequently asked questions

What moisture levels can Mapeproof 1K Turbo be used on?

It is a moisture vapour barrier for cement-based substrates that are not subject to rising damp but have a residual humidity higher than the Australian Standard, from 80% RH up to 95% RH (ASTM F2170 as per AS 1884). The data sheet gives the maximum residual relative humidity permitted as up to 95% RH, and states it must not be applied on wet surfaces or in the presence of rising damp.

How long before flooring can be laid over Mapeproof 1K Turbo?

At 23 degrees C and 50% RH, the product loses tack after 30 to 40 minutes and is set to light foot traffic at 60 minutes. Timber flooring can be installed directly with a reactive adhesive after at least 2 hours and no more than 24 hours. Waiting time between coats is a minimum of 40 minutes and a maximum of 2 hours.

How much Mapeproof 1K Turbo is used per square metre?

Consumption is 0.1 to 0.4 kg/m2 per coat. One coat can be sufficient over concrete providing there is a continuous dry film. More porous substrates such as screeds, or substrates in poor condition, need a second layer once the first coat is suitable for light foot traffic.

Related Products

Added to cart

View cart